SYLLABUS FOR PROJECT ENGINEER (CIVIL)/
CIVIL SUPERVISORS/ CONSTRUCTION SURVEYORS
- Documentation Work (Preparation and Submittals).
- Surveying.
- Construction Activities.
- Sub-Contractor Works.
- Quantity Surveying and Planning.
- Building Materials.
- General Engineering Concepts.
Documentation Work
(Preparation and Submittals)
- Work Schedule & Procurement Schedule.
- RAMS (Risk assessment & method statement).
- ITP (Inspection and Testing Plan).
- HSE Plan (Health Safety and Environment).
- Detail Scope of Work, Specifications & Construction
- drawings.
- Shop drawings.
- Material Submittals.
- RFI (Request for inspection), I.R
- (Inspection Request).
- DAR (Daily Activity Report).
- As-Built drawing.
- Industrial work systems like Engineering, Purchase, Accounts, Store & Dispatch, etc.
Surveying
- Definitions of Surveying & Importance of Surveying.
- Types of Surveying.
- Chain Survey Procedures.
- Compass Surveying.
- Errors and Corrections.
- Plane Table Surveying.
- Leveling and measurement of Elevations.
- Different Methods of Levelling.
- Theodolite Surveying.
- Electronic Distance Measuring (EDM).
- Total Station.
- GPS.
Construction Activities
- Site Mobilization.
- Setting out of grid lines.
- Underground Scanning to get a general idea about Underground Services.
- Excavation including Shoring and Dewatering.
- Soil improvement as per required SBC of soil.
- Preparation of BBS (bar bending schedule).
- Concreting.
- Sub-structure Waterproofing.
- Soil tests (Plate load test, Field density test etc).
- Concrete tests (Slump test, Temperature test, Cube test).
- Understanding of Formwork.
- Block work and Brick work.
- Plastering.
- Precast slab with Waterproofing details.
- Finishes.
- Plumbing, Drainage and other services.
- Electrical works.
- HVAC works.
- Fire alarm & Fire Fighting.
- External work including Asphalting.
- Land scape works.
Quantity Surveying and Planning
- Work Schedule.
- 2 week/ 3 week Look Ahead Program.
- Procurement Schedule.
- Manpower and Equipment Histogram.
- Preparation of S-Curve.
- Estimation of Quantities.
Building Materials
- Rock boulder, Type A fill, Type B fill, Desert fill, Crusher fine, etc.
- Cement, Sand and Aggregate.
- Ready Mix Concrete.
- Rebar and Weld mesh.
- Block, Kerbstone, Interlocking block pavers.
- Paints.
- Tiles.
- Asphalt mix.
- Plumbing and drainage materials.
General Engineering Concepts
- RCC Foundation: Isolated footing, Combine footing, Strip footing & Raft footing etc.
- Ground Slab including Construction joints, Expansion joints & Isolated joints etc.
- RCC Column: Uni-axial column, Bi-axial column, Long column & Short column etc.
- RCC Beam: Simply supported beam, Continuous beam, Fixed beam & Cantilever beam etc.
- RCC Roof Slab: Cast in situ slab, One-way slab, Two-way slab, Hollow Core slab & Post – Tensioned Slab etc.
- RCC Retaining Wall & RCC Ramps.
Eligibility
ITI or Civil Diploma
Duration
6 Months