SYLLABUS FOR PROJECT ENGINEER (CIVIL)/
CIVIL SUPERVISORS/ CONSTRUCTION SURVEYORS

  • Documentation Work (Preparation and Submittals).
  • Surveying.
  • Construction Activities.
  • Sub-Contractor Works.
  • Quantity Surveying and Planning.
  • Building Materials.
  • General Engineering Concepts.

Documentation Work

(Preparation and Submittals)

  • Work Schedule & Procurement Schedule.
  • RAMS (Risk assessment & method statement).
  • ITP (Inspection and Testing Plan).
  • HSE Plan (Health Safety and Environment).
  • Detail Scope of Work, Specifications & Construction
  • drawings.
  • Shop drawings.
  • Material Submittals.
  • RFI (Request for inspection), I.R
  • (Inspection Request).
  • DAR (Daily Activity Report).
  • As-Built drawing.
  • Industrial work systems like Engineering, Purchase, Accounts, Store & Dispatch, etc.

Surveying

  • Definitions of Surveying & Importance of Surveying.
  • Types of Surveying.
  • Chain Survey Procedures.
  • Compass Surveying.
  • Errors and Corrections.
  • Plane Table Surveying.
  • Leveling and measurement of Elevations.
  • Different Methods of Levelling.
  • Theodolite Surveying.
  • Electronic Distance Measuring (EDM).
  • Total Station.
  • GPS.

Construction Activities

  • Site Mobilization.
  • Setting out of grid lines.
  • Underground Scanning to get a general idea about Underground Services.
  • Excavation including Shoring and Dewatering.
  • Soil improvement as per required SBC of soil.
  • Preparation of BBS (bar bending schedule).
  • Concreting.
  • Sub-structure Waterproofing.
  • Soil tests (Plate load test, Field density test etc).
  • Concrete tests (Slump test, Temperature test, Cube test).
  • Understanding of Formwork.
  • Block work and Brick work.
  • Plastering.
  • Precast slab with Waterproofing details.
  • Finishes.
  • Plumbing, Drainage and other services.
  • Electrical works.
  • HVAC works.
  • Fire alarm & Fire Fighting.
  • External work including Asphalting.
  • Land scape works.

Quantity Surveying and Planning

  • Work Schedule.
  • 2 week/ 3 week Look Ahead Program.
  • Procurement Schedule.
  • Manpower and Equipment Histogram.
  • Preparation of S-Curve.
  • Estimation of Quantities.

Building Materials

  • Rock boulder, Type A fill, Type B fill, Desert fill, Crusher fine, etc.
  • Cement, Sand and Aggregate.
  • Ready Mix Concrete.
  • Rebar and Weld mesh.
  • Block, Kerbstone, Interlocking block pavers.
  • Paints.
  • Tiles.
  • Asphalt mix.
  • Plumbing and drainage materials.

General Engineering Concepts

  • RCC Foundation: Isolated footing, Combine footing, Strip footing & Raft footing etc.
  • Ground Slab including Construction joints, Expansion joints & Isolated joints etc.
  • RCC Column: Uni-axial column, Bi-axial column, Long column & Short column etc.
  • RCC Beam: Simply supported beam, Continuous beam, Fixed beam & Cantilever beam etc.
  • RCC Roof Slab: Cast in situ slab, One-way slab, Two-way slab, Hollow Core slab & Post – Tensioned Slab etc.
  • RCC Retaining Wall & RCC Ramps.

Eligibility

ITI or Civil Diploma

Duration

6 Months

 

Become Part of a Growing Community Learning with NSDIF

Become Part of NSDIF to Further Your Career.